Thursday, July 19, 2012

Team Ice Cream Day 2

Team Ice Cream

At the greatest worksite, with the greatest team, it was about one hundred degrees, everyone was sweating buckets but we knew we had a big job and didn’t want to stop till we met our goal. Katy, Jim and Nick cleaned out a whole room that was filled up to Katy’s waist with debris. All of it got shoveled up, bagged, and tossed out the window. We also found and were able to save some vintage trains. Betsy along with Morgan carried all of the bags and other trash to the dumpster. The dumpster is approximately twenty feet long, six feet deep and eight feet wide! About one-third of the stuff in the dumpster came from the room Katy, Jim, and Nick cleaned out. Anthony’s contractor skills came in handy as he built the frames for holding up the dry wall for the ceilings. I’ll bet everyone’s appreciated that. He also completely vacuumed out the entire room that was emptied. Tyler and Cori are renovating the kitchen by replacing tiles in a drop ceiling and prepped the floor for new linoleum tiles. Cori thought bombs were going off when the demolition was going on and dropping dirt all over them. There are two work teams at this same sight and we really learned to work well together and can’t wait for tomorrow.

Ice Cream

No comments:

Post a Comment